DTE Dry Fly Ash…

Project Location:  DTE Monroe Power Plant Owner: DTE Completion: December 2023 Project Manager: Charles J West PMI to install over 30,000 feet of piping. The project consists of installing a

Read more

Ford Engineering Lab (FEL)

Project Title : Ford Engineering Lab (FEL) Project Location:  Dearborn, MI Completion:  11/30/2023 Project Manager:  Mike Roberts Design and Installation of the fire protection systems for the building renovation.

Read more

Ford TEVC – Fire…

Project Title : Ford TEVC Site – Fire Protection Project Location:  Stanton, TN Completion:  11/30/2023 Project Manager:  Mike Roberts Installation of (3) fire pump houses and the underground fire

Read more

Freeze Protection Pump Installation

Project Title : Freeze Protection Pump Installation at Imlay City Pumping Station Project Location: Imlay City , MI Completion:  07/01/2023 Project Manager:  Mario W. Anetrini Great Lakes Water Authority (GLWA)

Read more

Mission Critical Data Centers

Project Title :Mission Critical Data Centers Project Location:Central Ohio Completion:12/31/24 Project Manager:Brooks Morgan Multi-building campus consisting of (1) new 216,000 sq/ft data center, (5) 128,000 sq/ft data centers, (2)

Read more

Henry Ford

Project Location: Macomb Owner: Henry Ford Health Systems Completion: 11/22 Project Manager: Craig Mercier Installation of one pre-action system for an electrical substation in the new powerplant, along with

Read more

GM DHAM DFZ BEV…

Project Location: Detroit/Hamtramck Owner: General Motors Completion: November 2022 Project Manager: Craig Mercier Installation of three wet pipe fire protection systems in the new battery parts storage racks.

Read more

2022 Crain’s Top 25…

See this year Crain’s list of Michigan’s largest veteran-owned businesses.

Read more

AMG Vanadium

Project Location: Zanesville, Ohio Owner: AMG Completion: October 2022 Project Manager: Criag Mercier AMG Vanadium LLC, a wholly owned subsidiary of AMG Advanced Metallurgical Group N.V., specializes in the

Read more

Ultium Cells 1

Project Location: Lordstown, Ohio Owner: Ultium Cells Completion: 7/30/2022 Project Manager: Charles J. Hosler Hot Oil Heater Equipment and Piping Installation.  The scope of work for this project included the installation of boilers, pumps,

Read more