Project Title : Freeze Protection Pump Installation at Imlay City Pumping Station
Project Location: Imlay City , MI
Completion: 07/01/2023
Project Manager: Mario W. Anetrini
Great Lakes Water Authority (GLWA) was seeking a pumping unit capable of draining the water in the existing reservoir at Imlay Pump Station (PS) every two days to maintain water quality and to provide demand capacity for the communities west of Imlay Pump Station.
Progressive Mechanical, Inc. was responsible for furnishing and installing the new circulation pump and cement lined piping from the existing reservoir to the city water main. Notable items of installation included a new 24” Double Disc Gate Valve, 20” Hydraulic Operated Fluid Controls Cone Valve, and 20” Triple Offset Butterfly Valve.