Project Title : Georgia St. Pump House
Project Location: Detroit, MI
Completion: 2/28/2025
Project Manager: Mike Roberts
The fire protection scope includes the following systems:
Installation of (2) 250-gallon water storage tanks & A Prefabricated Fire Pump House