Project Location: DTE Monroe Power Plant
Owner: DTE
Completion: December 2023
Project Manager: Charles J West
PMI to install over 30,000 feet of piping. The project consists of installing a hybrid piping system of 14” and 10” Nuvaloy piping and carbon steel welded from reworked precip hoppers in 4 units, to a new ash silo on PMI installed pipe trestles. PMI also installed control air, station air, waste water piping, and effluent water systems. PMI coordinated new taps for this project on the domestic water and sanitary pipelines. PMI set new ash blowers, air compressors, dryers, and ash filters. We also coordinated HVAC, controls, and insulation sub contractors.